top of page

FAULT LOCATION

 

Test Gear Limited offer a quick and efficient solution to all cable faults.

 

Low voltage to High voltage cables systems.

230 volt to 400,000 volt

 

Fault location on any cable system

EARTHING SYSTEM INSTALLATION

Providing earthing installation 

Earth testing

Insurance to cover deep works

Completion of handover paperwork

Braising & Exo thermic 

C55 Approval Tests


 

 

About

 

UNTIL RECENTLY  OUR FAULT LOCATION SERVICES WERE CONFINED MAINLY TO THE DISTRIBUTION NETWORK OPERATORS. 

WORKING TO THE DISTRIBUTION SAFETY RULES AS OUR STANDARD. 

 

ALL TRANSMISSION WORK IS COMPLETED IN ACCORDANCE WITH ENA REGULATIONS

 

ABLE TO PROVIDE A SERVICE ANYWHERE IN THE UNITED KINGDOM.

ENGINEER COMPETENCIES INCLUDE:

 

NATIONAL GRID NSI9

NETWORK RAIL PTS IWA

LONDON UNDERGROUND

MOD CLEARED

SHELL OFF SHORE  VANTAGE

BNFL

 

CURRENTLY:

 

UKPN AUTHORISED

GTC AUTHORISED

CONFINED SPACE   ABC

CSCS

FIRST AID

 

 

Services

 

 

Cable Core Fault Location

 

CABLE CORE FAULT LOCATIONS         

230volt TO 400,000volt CABLE SYSTEMS

 

Cable Sheath Fault Location

NEW INSTALLATIONS OFTEN INCUR SHEATH DAMAGE.

WE SPECIALISE  IN DUCTED CABLE SYSTEM FAULTS

11,000 VOLT TO 400,000 VOLT SYSTEMS

 

CABLE TRACING AND IDENTIFICATION

CONTROL AND PILOT CABLE FAULT LOCATION

DISTRIBUTION CABLE AUDIT TESTS

PROVIDED FOR

SCOTTISH AND SOUTHERN

WESTERN POWER

NATIONAL GRID

UK POWER NETWORKS

Earthing

ONE OF ONLY A HANDFULL OF COMPANIES TRAINED, AUTHORISED AND INSURED TO WELD AND DEEP DRIVE HIGH VOLTAGE EARTH NESTS.

INSTALLATION ON SYSTEMS UPTO 400,000 VOLT.

CERTIFIED COPPER BRAISING AND EARTH TESTING.

33000 VOLT PRIMARY EARTHING.

EXTERNAL AND INTERNAL 

132 000 VOLT CROSS BONDED SYSTEM EARTHING NESTS.

FULL INSTALATION AND ASSOCIATED TESTS

LINK BOX BONDING AND SVL TESTING

 

FULL  C55 COMPLIANCY TESTING

 

Projects

 

Cable Faults

 

FROM OIL RIGS TO BUILDING SITES CABLE FAULTS WILL OCCUR.

 

RECENTLY THE DEMAND FOR SUSTAINABLE ENERGY HAS SEEN TEST GEAR LIMITED PROVIDE FAULT LOCATION FOR SOLAR FARMS, WIND TURBINE INSTALLATIONS AND BATTERY STORAGE FACILITIES.

 

INDEPENDENT CONNECTION PROVIDERS IN THE UK HAVE FOUND OUR SERVICES AND ADVICE INVALUABLE DUE TO THE AUDIT AND CONNECTION DATE DEADLINES IMPOSED BY THE DISTRIBUTION NETWORK OPERATORS. 

Earthing Installations

IN THE LAST TEN YEARS WE HAVE INSTALLED EARTHING SYSTEMS IN COMPLIANCE WITH UK POWER NETWORK DESIGNS.

11000 VOLT TO THE NEW 132000VOLT DUAL CIRCUIT TWIN MAT SYSTEMS.

FULL C55 TESTS COMPLETED.

 

bottom of page