Test Gear Ltd
Serving the United Kingdom
FAULT LOCATION
Test Gear Limited offer a quick and efficient solution to all cable faults.
Low voltage to High voltage cables systems.
230 volt to 400,000 volt
Fault location on any cable system
EARTHING SYSTEM INSTALLATION
Providing earthing installation
Earth testing
Insurance to cover deep works
Completion of handover paperwork
Braising & Exo thermic
C55 Approval Tests
About
UNTIL RECENTLY OUR FAULT LOCATION SERVICES WERE CONFINED MAINLY TO THE DISTRIBUTION NETWORK OPERATORS.
WORKING TO THE DISTRIBUTION SAFETY RULES AS OUR STANDARD.
ALL TRANSMISSION WORK IS COMPLETED IN ACCORDANCE WITH ENA REGULATIONS
ABLE TO PROVIDE A SERVICE ANYWHERE IN THE UNITED KINGDOM.
ENGINEER COMPETENCIES INCLUDE:
NATIONAL GRID NSI9
NETWORK RAIL PTS IWA
LONDON UNDERGROUND
MOD CLEARED
SHELL OFF SHORE VANTAGE
BNFL
CURRENTLY:
UKPN AUTHORISED
GTC AUTHORISED
CONFINED SPACE ABC
CSCS
FIRST AID
Services
Cable Core Fault Location
CABLE CORE FAULT LOCATIONS
230volt TO 400,000volt CABLE SYSTEMS
Cable Sheath Fault Location
NEW INSTALLATIONS OFTEN INCUR SHEATH DAMAGE.
WE SPECIALISE IN DUCTED CABLE SYSTEM FAULTS
11,000 VOLT TO 400,000 VOLT SYSTEMS
CABLE TRACING AND IDENTIFICATION
CONTROL AND PILOT CABLE FAULT LOCATION
DISTRIBUTION CABLE AUDIT TESTS
PROVIDED FOR
SCOTTISH AND SOUTHERN
WESTERN POWER
NATIONAL GRID
UK POWER NETWORKS
Earthing
ONE OF ONLY A HANDFULL OF COMPANIES TRAINED, AUTHORISED AND INSURED TO WELD AND DEEP DRIVE HIGH VOLTAGE EARTH NESTS.
INSTALLATION ON SYSTEMS UPTO 400,000 VOLT.
CERTIFIED COPPER BRAISING AND EARTH TESTING.
33000 VOLT PRIMARY EARTHING.
EXTERNAL AND INTERNAL
132 000 VOLT CROSS BONDED SYSTEM EARTHING NESTS.
FULL INSTALATION AND ASSOCIATED TESTS
LINK BOX BONDING AND SVL TESTING
FULL C55 COMPLIANCY TESTING
Projects
Cable Faults
FROM OIL RIGS TO BUILDING SITES CABLE FAULTS WILL OCCUR.
RECENTLY THE DEMAND FOR SUSTAINABLE ENERGY HAS SEEN TEST GEAR LIMITED PROVIDE FAULT LOCATION FOR SOLAR FARMS, WIND TURBINE INSTALLATIONS AND BATTERY STORAGE FACILITIES.
INDEPENDENT CONNECTION PROVIDERS IN THE UK HAVE FOUND OUR SERVICES AND ADVICE INVALUABLE DUE TO THE AUDIT AND CONNECTION DATE DEADLINES IMPOSED BY THE DISTRIBUTION NETWORK OPERATORS.
Earthing Installations
IN THE LAST TEN YEARS WE HAVE INSTALLED EARTHING SYSTEMS IN COMPLIANCE WITH UK POWER NETWORK DESIGNS.
11000 VOLT TO THE NEW 132000VOLT DUAL CIRCUIT TWIN MAT SYSTEMS.
FULL C55 TESTS COMPLETED.